Florin Perkins Rate structure effective May 1, 2013
Prices subject to change, contact our office for current prices. There is a $20.00 minimum charge on all items per vehicle. Measurement of load is by volume with no allowance for air space. No hazardous wastes will be accepted. No wet garbage, yard waste or food waste will be accepted. A load checking program is in effect. No environmental fees or fuel surcharges.
|
RATE STRUCTURE FOR INBOUND MATERIAL
|
|
|---|---|
|
Material Type
|
Price Per Cubic Yd.
|
| Wood (clean without paint or treatment) |
$5.00
|
| Concrete - 1 (minimal dirt, brick, rebar < 2') |
$5.00
|
| Concrete - 2 (dirt, brick, rebar, clean stucco, < 2') |
$10.00
|
| Concrete - 3 (> 10% trash by volume, wire, < 2') |
$20.00
|
| Concrete - Large/Structural (> 2' in any direction) |
$35.00
|
| Trash/Debris |
$10.00
|
| Mixed C&D (construction & demolition) |
$10.00
|
| Sheetrock |
$10.00
|
| Brush (tree trimmings, wood chips, etc.) |
$5.00
|
| Brush/Trees - Oversized (>2' in diameter) |
$20.00
|
| Wood Shingles (with tar paper) |
$10.00
|
| Dirt & Sod |
$12.00
|
| Composite Roofing |
$15.00
|
| Transactions > 5 Cubic Yards |
$40.00 ton/$34 min
|
| Refrigerators/Air Conditioners |
$23.00 each
|
| Appliances |
$10.00 each
|
| Tires - Passenger Cars |
$5.00 each
|
| Tires - Truck |
$15.00 each
|
| Tires - Large (Tractor) |
$50.00 each
|
| Electronic Waste (TVs, Monitors, Computers, etc.) |
No Additional Cost
|
| Tractor Assistance |
$20.00 load
|
| Minimum Load Charge |
$20.00 load
|